This website uses cookies to enhance your experience.

The Sewer Flow Must Continue in Hollywood, FL

Friday, June 4, 2021

During a lift station pump repair in Hollywood, FL, it is critical for all sewer lines to continue to flow. Our new 6-inch BA150KS temporary sewer bypass pump is just the pump for the job. The centrifugal pump with screw channel impeller can handle a sewer flow with 4-inch solids, much greater than the industry standard. Residential properties are tightly squeezed within the beautiful palm-dotted Hollywood Beach area, and the sound attenuated pumps are greatly appreciated by not only the City of Hollywood, but by their residents and local businesses as well.

The extremely quiet diesel driven BBA Pump was purchased by the City of Hollywood via the Florida Sheriffs Association contract. The flow is controlled with auto-floats which are connected into the lift station. As the sewer level rises, the BA150KS pump starts automatically and stops again when the level is low. This not only improves fuel savings but also reduces running hours and the associated maintenance costs.  

BA150KS D285 Trailer Mounted Sewage Pump Hollywood Florida
Loading
Loading